
Substation BIM support. Start with a focused pilot.
Evaluate our Revit modeling, electrical families or existing-model updates on a defined part of your project before committing to a larger scope.
Your project standards. Agreed deliverables. A clear decision before moving forward.
Paid pilot. Defined scope. No obligation to proceed to a full project.
BIM Eléctrico AcademyES·Our Revit training for electrical engineersThree services. One specialty: electrical BIM.

Substation Modeling in Revit
Model substation equipment, supporting structures and associated systems from your engineering information and project requirements.
Possible pilot: a defined equipment arrangement or a representative portion of the substation model.

Custom Revit Electrical Families
Develop electrical equipment families aligned with your required geometry, parameters and project standards.
Possible pilot: one representative equipment family, tested against agreed requirements.

Existing Substation Model Updates
Update existing model content using available drawings, markups and other agreed source information.
Possible pilot: a defined model area or a limited revision package.
Review relevant work before you decide.
Sample model views from our Revit work on substations, electrical equipment families and model updates.

138kV AIS substation, five bays
Full 3D model and plan sets from 2D drawings, including equipment families.
View project
Substation bay and switchgear lineup
Substation model plus switchgear lineup, coordinated for clash review.
View project
High-voltage interconnection bay
Disconnector switches, breakers and bus connections modeled in Revit.
View projectExtra BIM capacity should help your team move forward.
Before bringing in an external team, you need to know how the work will fit your standards, review process and project schedule.
Will the deliverables follow our standards?
We adopt your templates, naming and information requirements before modeling starts. The pilot is built to your standards, so you evaluate the real thing.
Can we see progress and resolve questions early?
Yes. Partial deliveries and review checkpoints are agreed up front, so questions surface while changes are inexpensive.
How much review and correction will our team need?
That is exactly what the pilot measures. You see the level of review your team needs before deciding to expand the engagement.
Our pilot gives your team a defined way to evaluate these questions before expanding the engagement.
Start small. Evaluate the work. Then scale.
Two connected phases. A focused pilot lets your team evaluate our work, then a larger project is defined and contracted separately.
Focused BIM Pilot
A paid, limited-scope assignment that lets your team evaluate our work using your project requirements.
Before we begin, we agree on
- The task and intended use of the deliverable.
- Available inputs and missing information.
- Revit version and applicable modeling standards.
- Deliverables and acceptance criteria.
- Review checkpoints and included revisions.
- Fee and delivery schedule.
What you receive
- The agreed pilot deliverable.
- Documented assumptions and open items.
- A review discussion to assess fit and next steps.
Pilot scope, pricing and timing are confirmed after reviewing your requirements.
Project Delivery
If the pilot meets the agreed criteria and both teams decide to continue, we define and quote the next project scope.
We agree on
- Project scope and deliverables.
- Production milestones and review responsibilities.
- Communication and progress reporting.
- Revision and change-management process.
- Commercial terms and delivery schedule.
The full project is a separate engagement. Completing the pilot does not automatically authorize additional work.
A focused pilot, then a separate project if it fits.
The pilot is a paid, limited-scope assignment. If it meets the agreed criteria and both teams decide to continue, the next project is defined and contracted separately.
The pilot phase
Each step is agreed before work begins. You evaluate the deliverable against your standards and decide whether to move to a larger engagement.
What should the pilot help you evaluate?
These criteria are a guide for evaluating the service, not guaranteed results.
Technical fit
Does the deliverable meet the agreed requirements for its intended use?
Standards alignment
Does the work follow the agreed templates, naming and information requirements?
Communication
Are questions, decisions and open items clear and documented?
Review effort
What level of review and correction does your team need before acceptance?
Your project. Our expertise. Let's talk.
Tell us what your team needs and the milestone you are working toward. We'll review whether a focused pilot is a suitable starting point.






